KUMAVISION factory#
See also the following ChangeLogs#
27.4.3461.0 - 2026-02-10#
Change
- General performance and stability improvements.
27.3.3431.0 - 2026-02-06#
Hotfix
- Fixed error on display of E+D-Order in Calculation (#16565, FCY-2321) If the E+D-Order was directly shown after calculating a sales quote, the page did not react to any action, the client had to be closed.
- Fixed error on validation of field "TypeOfPartProvided" in PDM-Interface (#16704, FCY-2347)
- Fixed display of sales price in delivery schedules (#16810, FCY-2367) The sales price was always shown as 0 i delivery schedules
Change
- Changed field "Code" on "Item Attributes" (#16509, FCY-2300) The field "Code" on "Item Attributes" is no longer mandatory, it can now be empty
- Changed tests on deletion of project accounts (#16617, FCY-2335) The project accounts were not deleteable. Logical tests on deletion were implemented to allow deletion
- Added video "Using the Picking Traffic Lights" to page "Product Videos" (#16719, FCY-2345)
- Modified permissionset "KVSFCYAPIPDM" (#16812, FCY-2368)
- Set field "KVSFCYExternalResource" in table "Resource" to obsolete (#16813, FCY-2364)
- Changed logic on deletion of projects (#16840, FCY-2374) On deletion of projects, the project was removed from the field "Project No." in all sales document headers and lines. This was changed to only happen if the project was not temporary.
27.3.3385.0 - 2026-01-21#
Hotfix
- Fixed sums in report KVSFCYDetailedCalculation (#16394, FCY-2292) If lines without type wetre used in production boms, the sums in the report were calculated incorrectly
- Fixed Application Area on action "Set Project Location" in page job task lines subform (#16497, FCY-2305)
- Fixed wrong period name on inbound release order comparison (#16498, FCY-2307) If a period was shown in calendar weeks, the wrong year could be displayed on the inbound release order comparison
Change
- Changed bin code on separation of production order in E+D-Order (#16243, FCY-2261)
- Do not test status on quotes on comined purchase quotes (#16368, FCY-2273) If the quantity in a combined purchase quote is changed, the status of attached purchase quotes is no longer checked
- Use project location code on "Create Project" (#16377, FCY-2281) If the action "Create Project" was used in a sales document, the location code of the created project will now be transferred to the field "Location Code" in the sales header
- Added support of texts in combine purchase quotes (#16393, FCY-2192) The combine purchase quote now supports item translations and G/L Account texts
- Changed calcformula for "KVSFCYWhseActivityLineExists" prod. order component to include "Invt. Movement" (#16502, FCY-2294)
- Set Page KVSFCYInvGLReconciliation to obsolete (#16506, FCY-2228)
- Clear project number in sales documents on deletion of a project (#16523, FCY-2310)
- Added support of french language (fr-FR) (#16564, FCY-2265)
- Remove data in field KVSFCYVendorNo in the project planning lines (#16567, FCY-2320) If the line type of a project planning line was changed to Billable, the field KVSFCYVendorNo was not cleared
- Copy field KVSFCYTypeOfOrder on the project planning lines (#16575, FCY-2323) If project planning lines were copied, the field KVSFCYTypeOfOrder was always set to "Planning"
- Moved field KVSFCYDampenerTimeTooLate from table manufacturing setup to inventory setup (#16589, FCY-2318)
- Copied field KVSFCYEtagisData in prod. order line and prod. order routing on prod order status change (#16619, FCY-2333) If the status on a production order was changed, the field KVSFCYEtagisData was not copied to the new production order
27.2.3266.0 - 2025-12-10#
Hotfix
- Fixed problem on report "Implement Preferred Standard Cost/Unit List Price Change" (#16001, FCY-2189) A new control was implemented to choose the price list into which the new proce was inserted
- Fixed wrong dimension values in project tasks (#16076, FCY-2233)
On copying project tasks, the dimensions values were not copied correctly - Fixed error on item card (#16157, FCY-2249) On opening the item card, an error was thrown if the table KVSFCYEngineeringDesignSetup was empty
- Fixed report "Implement Calculation Worksheet (Plan Values)" (#16198, FCY-2182)
Running the report could result in a plan value not to be transferred to the calculation conditions - Fixed error on warehouse shipments in combination with resources (#16297, FCY-2267) If a warehouse shipment ws created with a resource, an error was thrown
- Fixed error on E+D-Order time fields(#16318, FCY-2275) the fields "Planned Time", "Used Time", "Outstanding Time" and "Used Time %" were not filled correctly on E+D-Orders
Change
- Added multiple field on item template (#15861, FCY-2191) The fields KVSFCYServiceComponentType, KVSFCYServicePartType, KVSFCYDampenerPeriodTooLate, KVSFCYOverProduction%, KVSFCYTypeOfPartProvided and KVSFCYMfgAutoCreateTrackLines were included in the item template functionality
- Expanded Demodata for additional languages (#16192, FCY-2255)
- Set Long-Dated Item Overview Factbox to obsolete (#16208, FCY-2251)
- ReDesign PDM-Status (#16210, FCY-2252) the fields in the PDM-Status were redesigend to better fit the standard functionality
- Assigned "Prod. Order Capacity Need" on separation of production orders (#16335, FCY-2277) On separate production orders the table "Prod. Order Capacity Need" is no filled
- Set field "Code" in item attribute and item attribute values to obsolete (7500)" (#16350, FCY-2276)
- etagis Interface: set: set App Id in wizard (#16359, FCY-2285)
27.1.3143.0 - 2025-11-14#
Hotfix
- Fixed Filter on Shortage List from E+D-Routing (#15908, FCY-2212)
- Fixed error on adding a project planning line (#15924, FCY-2218)
If a project planning line with a planning date outside the planned dates on the corresponding project task an error was thrown - Fixed posting error on dispatch handling orders for delivery schedules (#16055, FCY-2230) If dispatch handling order contained a delivery schedule with consignment processing it could not be posted
- Fixed copy item (#16113, FCY-2242) If the copy item functionality was used, the production BOM and the routing was not copied
Change
- Added field "Bin Code" to E+D-Lists (#15980, FCY-2224)
- Demo-data was expanded by capacity units of measure (#15997, FCY-2219)
- Subcontracting with different units of measure (#16017, FCY-2126) It is now possible to define a differnt unit of measure on subcontracting purchase orders
- Added check on vendor on creation of purchase orders from a project (#16060, FCY-2231) If multiple project planning lines are sent to a purchase order, it will now be checked that all have the same "Vendor No."
- Removed actions on archived sales quotes (#16064, FCY-2234) The action to open archived calculation tracking was removed from the archived sales quotes
- Change check on Bill-to Customer in project (#16071, FCY-2235) If a customer was chosen in the "Bill-to Customer No." in projects, the customer was tested if the "Bill-to No." was empty. This was changed, so the "Bill-to No." can now also contain the customer no.
- Removed check on E+D-Job No. in the E+D modification proposal (#16102, FCY-2239)
- Removed check in "Indirect Cost %" in external resources (#16106, FCY-2241) "Indirect Cost %" can now be entered in external resources
- Changed check on Overproduction (#16119, FCY-1676) Instead of a boolean variable you can now choose between no check, check with dialog and check without dialog
27.0.3028.0 - 2025-10-21#
Hotfix
- Fixed wrong calculation if the work center has different unit of measure (#15762, FCY-2152) If a routing line was using a different unit of measure than its corresponding work center, the routing cost were not calculated correctly.
Change
- Additional Setup- and Demodata (#15733, FCY-2142) Added an additional Demo-item with assembly
- Changed display of production bom and routing in production bom versions (#15849, FCY-2184) In rare cases production bom version did not display the produuction bom and routing no. correctly
- Changed unit of measure in subcontracting worksheet (#15890, FCY-2208) Changed the way a unit of measure was found for a subcontracting worksheet line. Instead of base unit of measure, now the correct unit of measure is used
27.0.2995.0 - 2025-10-15#
Hotfix
- Fixed error on calculating items with production BOMs containing production BOMs (#15756, FCY-2151) If an item with a production BOM was calculated and the item structure contains production BOMs with production BOMs, an error was shown that an item unit of measure was missing. This was fixed.
- Changed pricing in subcontracting worksheet (#15826, FCY-2173)
The pricing in the subcontracting worksheet was changed with work centers with unit cost calculation "time"
Change
- Reorganized ApplicationAreas (#15207, FCY-2009)
- Changed E+D modification proposal (#15763, FCY-2130) A change to the planning level will now be displayed in the E+D modification proposal worksheet.
- Changed action "Create Project" in sales order and sales quote (#15764, FCY-2155) It is now possible to chose a no. series for the creation of the new project
- Changed creation of put-aways in combination with subcontracting (#15806, FCY-2165) Creation of a putaway from a warehouse receipt with multiple lines of the same item could lead to wrong quantities in the put-away lines, if the sames lot no. was used