KUMAVISION factory#

See also the following ChangeLogs#

27.2.3266.0 - 2025-12-10#

Hotfix

  • Fixed problem on report "Implement Preferred Standard Cost/Unit List Price Change" (#16001, FCY-2189) A new control was implemented to choose the price list into which the new proce was inserted
  • Fixed wrong dimension values in project tasks (#16076, FCY-2233)
    On copying project tasks, the dimensions values were not copied correctly
  • Fixed error on item card (#16157, FCY-2249) On opening the item card, an error was thrown if the table KVSFCYEngineeringDesignSetup was empty
  • Fixed report "Implement Calculation Worksheet (Plan Values)" (#16198, FCY-2182)
    Running the report could result in a plan value not to be transferred to the calculation conditions
  • Fixed error on warehouse shipments in combination with resources (#16297, FCY-2267) If a warehouse shipment ws created with a resource, an error was thrown
  • Fixed error on E+D-Order time fields(#16318, FCY-2275) the fields "Planned Time", "Used Time", "Outstanding Time" and "Used Time %" were not filled correctly on E+D-Orders

Change

  • Added multiple field on item template (#15861, FCY-2191) The fields KVSFCYServiceComponentType, KVSFCYServicePartType, KVSFCYDampenerPeriodTooLate, KVSFCYOverProduction%, KVSFCYTypeOfPartProvided and KVSFCYMfgAutoCreateTrackLines were included in the item template functionality
  • Expanded Demodata for additional languages (#16192, FCY-2255)
  • Set Long-Dated Item Overview Factbox to obsolete (#16208, FCY-2251)
  • ReDesign PDM-Status (#16210, FCY-2252) the fields in the PDM-Status were redesigend to better fit the standard functionality
  • Assigned "Prod. Order Capacity Need" on separation of production orders (#16335, FCY-2277) On separate production orders the table "Prod. Order Capacity Need" is no filled
  • Set field "Code" in item attribute and item attribute values to obsolete (7500)" (#16350, FCY-2276)
  • etagis Interface: set: set App Id in wizard (#16359, FCY-2285)

27.1.3143.0 - 2025-11-14#

Hotfix

  • Fixed Filter on Shortage List from E+D-Routing (#15908, FCY-2212)
  • Fixed error on adding a project planning line (#15924, FCY-2218)
    If a project planning line with a planning date outside the planned dates on the corresponding project task an error was thrown
  • Fixed posting error on dispatch handling orders for delivery schedules (#16055, FCY-2230) If dispatch handling order contained a delivery schedule with consignment processing it could not be posted
  • Fixed copy item (#16113, FCY-2242) If the copy item functionality was used, the production BOM and the routing was not copied

Change

  • Added field "Bin Code" to E+D-Lists (#15980, FCY-2224)
  • Demo-data was expanded by capacity units of measure (#15997, FCY-2219)
  • Subcontracting with different units of measure (#16017, FCY-2126) It is now possible to define a differnt unit of measure on subcontracting purchase orders
  • Added check on vendor on creation of purchase orders from a project (#16060, FCY-2231) If multiple project planning lines are sent to a purchase order, it will now be checked that all have the same "Vendor No."
  • Removed actions on archived sales quotes (#16064, FCY-2234) The action to open archived calculation tracking was removed from the archived sales quotes
  • Change check on Bill-to Customer in project (#16071, FCY-2235) If a customer was chosen in the "Bill-to Customer No." in projects, the customer was tested if the "Bill-to No." was empty. This was changed, so the "Bill-to No." can now also contain the customer no.
  • Removed check on E+D-Job No. in the E+D modification proposal (#16102, FCY-2239)
  • Removed check in "Indirect Cost %" in external resources (#16106, FCY-2241) "Indirect Cost %" can now be entered in external resources
  • Changed check on Overproduction (#16119, FCY-1676) Instead of a boolean variable you can now choose between no check, check with dialog and check without dialog

27.0.3028.0 - 2025-10-21#

Hotfix

  • Fixed wrong calculation if the work center has different unit of measure (#15762, FCY-2152) If a routing line was using a different unit of measure than its corresponding work center, the routing cost were not calculated correctly.

Change

  • Additional Setup- and Demodata (#15733, FCY-2142) Added an additional Demo-item with assembly
  • Changed display of production bom and routing in production bom versions (#15849, FCY-2184) In rare cases production bom version did not display the produuction bom and routing no. correctly
  • Changed unit of measure in subcontracting worksheet (#15890, FCY-2208) Changed the way a unit of measure was found for a subcontracting worksheet line. Instead of base unit of measure, now the correct unit of measure is used

27.0.2995.0 - 2025-10-15#

Hotfix

  • Fixed error on calculating items with production BOMs containing production BOMs (#15756, FCY-2151) If an item with a production BOM was calculated and the item structure contains production BOMs with production BOMs, an error was shown that an item unit of measure was missing. This was fixed.
  • Changed pricing in subcontracting worksheet (#15826, FCY-2173)
    The pricing in the subcontracting worksheet was changed with work centers with unit cost calculation "time"

Change

  • Reorganized ApplicationAreas (#15207, FCY-2009)
  • Changed E+D modification proposal (#15763, FCY-2130) A change to the planning level will now be displayed in the E+D modification proposal worksheet.
  • Changed action "Create Project" in sales order and sales quote (#15764, FCY-2155) It is now possible to chose a no. series for the creation of the new project
  • Changed creation of put-aways in combination with subcontracting (#15806, FCY-2165) Creation of a putaway from a warehouse receipt with multiple lines of the same item could lead to wrong quantities in the put-away lines, if the sames lot no. was used