KUMAVISION factory#

21.17.133304.0 - 2024-03-04#

Hotfix

  • Plant Engineering: "Qty. Transferred to Invoice" at deletion of assigned sales order (#8345, FCY-1154)

Change

  • Removed Error on Attribute Search (#8408, FCY-1163)

21.16.125341.0 - 2024-01-29#

Hotfix

  • Printing item attributes in purchase receipts anf sales shipments corrected (#8139, FCY-1105)
  • Corretion at creating purchase orders from project planning line for non-inventoryable items (#8147, FCY-1107)
  • Page ressource availability corrected (#8150, FCY-1108)
    Recalulating subpage at changing periods.
  • Printing item attributes in sales and purchase documents for item variants and item versions corrected (#8162, FCY-1115)
  • Update date conflict in multiple reservation entries corrected (#8227, FCY-1138)
  • Value entries of type "variance" for material overhead costs at inventory adjustment corrected (#8131, FCY-1102)

Change

  • Zero-Division at "obsolete" codeunit KVSFCYJobStructureMgt removed (#8153, FCY-1111)

21.15.121432.0 - 2024-01-12#

Hotfix

  • Payment Terms Code at job creation (#7924, FCY-1062)
  • Calculation: new unit list price was not converted to foreign currency at transfer to sales quote (#7929, FCY-1064)
  • Reservation in production order was deleted in planning worksheet if date conflict was enabled (#8087, FCY-1095)

21.14.114293.0 - 2023-12-05#

Change

  • General performance and stability improvements.

21.13.112423.0 - 2023-11-27#

Hotfix

  • Obligation Transfer Orders by Job Planning Line (#7492, FCY-965)
  • Metal Surcharge: charge was not assigned automatically (#7570, FCY-974)

Change

  • Item Calculation: value entries for variance were not created for material overhead costs and capacity overhead costs (#7638, FCY-996)
  • Get source documents failed for transfer orders in warehouse receipt (#7735, FCY-1017)

21.12.102706.0 - 2023-10-09#

Hotfix

  • The behavior of the actions on the E+D-Order lines showing Components or Production Journal was fixed and unified. (#7087, FCY-882)
  • Assignment of capacity unit of measure of resource to reference unit of measure in Manufacturing Setup (#7152, FCY-911)
  • Transfer of suggested price into price list (#7157, FCY-916)
  • Differences in production overhead costs in Production Order Calculation and Item Calculation (#7158, FCY-915)
  • Corrected inheritance of item attributes to item version (#7222, FCY-927)
  • Obligo Quantity (Hours) should be 0 on Work Centers with unit cost calculation = units (#7241, FCY-931)
  • Subcontracting cost were not respected if calculation module was not activated (#7276, FCY-937)
  • Production Order Calculation: Requested Receipt Date was not respected in purchase prices. (#7280, FCY-936)
  • Production Order Calculation did not always respect finished quantity (#7312, FCY-945)

21.11.96695.0 - 2023-09-06#

Hotfix

  • Fixed error at unapplying vendor ledger entry (#7083, FCY-902)

21.10.95950.0 - 2023-09-04#

Hotfix

  • Fixed License-Check in combined purch quotes (#6946, FCY-873)
  • Error in E+D Modification Proposal if the field "Modification felxibility" was set to "None" (#7015, FCY-892)
  • Fixed "Finished Quantity" in E+D-Orders (#7017, FCY-880)

Change

  • Item Attributes: Where-Used (#6994, FCY-886)

21.10.91481.0 - 2023-08-08#

Change

  • General performance and stability improvements.

21.9.91289.0 - 2023-08-07#

Hotfix

  • Subcontracting worksheet lines of items with replenishment system "purchase&Quot; deleted by calculate requesition worksheet (#6636, FCY-789)
    On page "Requisition Worksheet" a filter was added to the "Calculate Plan..." action to prevent the deletion of records in the "Subcontracting Worksheet" (with "Operation No." <>'').
  • Layout of traffic lights in E+D factboxes not correct (#6667, FCY-812)
    Traffic lights in factboxes removed, because they still placed on listpages.
  • Same line types at project document text templates and project planning lines (#6715, FCY-829)
  • Purchase price of quantity scale was not considered in item Calulation (#6734, FCY-832)
  • Quantity scales no considered in sales price calculation (#6815, FCY-852)

Change

  • Obligation for transfer orders implemented (#6680, FCY-815)
  • Update of status in item versions allowed by external modification (#6716, FCY-830)

21.9.89576.0 - 2023-07-28#

Hotfix

  • Correction of Starting and Ending Date in Prod. Order routing (#6767, FCY-838)

21.9.86489.0 - 2023-07-10#

Hotfix

  • Base price evaluation in sales condition "price condition (sales price)" corrected (#5898, FCY-697)
    Currency and starting date ov sales prices has not considered in The evaluation.
  • Job planning line duplicated by posting purchase document, if line type "Budget and Billable" is allowed (#6312, FCY-752)
  • Production order shortage list corrected (#6326, FCY-758)
  • Calculation of "Physical Inventory Counting Period" corrected (#6632, FCY-796)
  • Version of production BOM not considered in E+D monitorin (#6382, FCY-762)

Change

  • Function "Undo Shipment" not allowed in sales shipments with project relations (#6292, FCY-751)
  • Posting of subcontracted items in direct transfer implemented (#6491, FCY-776)
  • Event for customisation of item attributes inheritance to item variant and item version (#6603, FCY-793)

21.8.80590.0 - 2023-06-06#

Hotfix

  • Warehouse shipment lines with assigned item charges could not be posted (#6131, FCY-728)

Change

  • Optimized performance in function calculate costs in E+D orders (#6075, FCY-723)
  • Field "item attributes expand" removed from page "item attribute card" and
    assignment of NAVDataType to attribute type "option" optimized (#6142, FCY-732)
  • New Event "OnAfterCalcCostTime" in "KVSFCYCalculateStandardCost" (#6216, FCY-741)

21.7.76073.0 - 2023-05-09#

Hotfix

  • Corrected Caption for "Milestone Date" in job planning line (#5783, FCY-668)
  • Code may not be blank in item attributes of type option (#5790, FCY-676)
  • Metal surcharge is not calculated for purchase documents (#5803, FCY-679)
  • Overhead cost are not calculated correctly, if module calculation is deactivated (#5833, FCY-685)
  • Service lines document texts in KBA-reports (#5892, FCY-695)
  • Implement standard cost change does not function correctly, if module calculation is deactivated (#5952, FCY-705)

Change

  • Handled-Pattern before Check Documents on Job Status Change (#5888, FCY-693)

21.6.72191.0 - 2023-04-12#

Change

  • General performance and stability improvements.

21.5.71674.0 - 2023-04-11#

Change

  • Job obligo: time obligo, purchase obligo, inventory obligo, order value (#5137, FCY-239)
  • Get shipping agent code and shipping agent service code from customer on creation of job planning line (#5601, FCY-629)
  • Calculation: do not respect specific unit cost (#5607, FCY-597)
  • Outstanding order quantity in blanket orders (#5622, FCY-639)

Hotfix

  • If posting fails, delivery schedule cannot be fetched again into the warehouse shipment (#5471, FCY-32)
  • Fixed deletion of "Custom Report Selection" (#5546, FCY-605)
  • Fixed client crahs on attribute search (#5567, FCY-608)
  • Use report KVSKBAIssPurchOrderConfRem instead of report KVSFCYIssPurchOrderConfRem (#5571, FCY-613)
  • Fixed test of job account setup at copying job tasks (#5599, FCY-427)
  • Fixed problem in job wizard if choosing "Back" (#5606, FCY-596)
  • Fixed error message in planning worksheet (#5619, FCY-634)
  • Fixed captions in long-dated items list (#5620, FCY-635)
  • Fixed transaction error in report KVSFCYCarryOutActionMsgPlan (#5621, FCY-636)
  • Traffic light was not shown correctly on lines of type production BOM in construction monitoring (#5641, FCY-642)
  • Milestone Date was not correctly copied if Copy Job Tasks was selected (#5648, FCY-646)
  • Foreign currency was not correctly respected in item calculation, if calculated by direct unit cost (#5651, FCY-641)
  • Fixed error in calculation with lot size 0 (#5660, FCY-601)

21.5.66163.0 - 2023-03-09#

Change

  • Shipping Time will now be applied to the job plan lines from customer (#5355, FCY-574)

Hotfix

  • Sales quote will now use the preferred price from calculation (#5419, FCY-586)
  • Obligo: permissions for indirect insert/delete (#5427, FCY-592)
  • Use correct price for resources on purchase orders with old price calculation(#5436, FCY-591)

21.4.65089.0 - 2023-03-03d#

Change

  • Job location could be initialized individual by project (#4949, FCY-509)
  • New design of obligation calculation for projects (#5153, FCY-544)
    The obligation amounts for purchase, inventory, production orders, assembly orders and time sheets will be calculated per batch function based on reservation entries and direct assignments.
  • The code field must be unique. There can also only be one empty code field. (#5204, FCY-550)
  • New publisher in codeunit 5026516 "KVSFCYGetSourceDocumentExt" (#5274, FCY-562)
  • Remove workaround in requesition worksheet fpr combine puchase quotes (#5329, FCY-410)
    A temporary workaround was implemented to prevent a MS bug from deleting Requisition Lines in special situations. MS fixed the bug, so the workaround was removed.
  • Replace FACTORY-report "Job Quote" by standard report selection (#5356, FCY-575)
  • Separate views for job planning lines in projects (#5384, FCY-581)
    Different views Purachase, Sales and Requesition are now available.
  • IntegrationEvent TableExtension 5026558 "KVSFCYProductionBOMVersionExt" (#5397, FCY-583)

Hotfix

  • Validation of sales person code in sales documents delete dimension "project type" (#5117, FCY-541)
  • Corrupt subcontracting order was created by E+D order planning (#5171, FCY-547)
  • Diffrent internal fields of E+D productions order line was incorrect aasigned (#5254, FCY-557)
  • Error in attribute search in combination with item versions and item variants (#5262, FCY-540)
  • The project type could selected and assigned in project wizard (MS-Standard) (#5264, FCY-375)
  • Incorrect values in field "invoiced quantity" of sales shipment lines and sales return receipt lines (#5325, FCY-568)
  • Diffrent sorting of calculation detail lines for production and assembly orders (#5336, FCY-485)
  • Correction in monetarisation of "plant engineering" (#5338, FCY-570)
  • Wrong calculation base in item calculation for purchase items (#5368, FCY-579)
  • Perrmissions for posted documentline in codunit "KVSFCYSalesPostSubscriber" added (#5396, FCY-582)

21.4.61648.0 - 2023-02-09#

Change

  • Change Report "Carry Out Action Msg." to ReportExtensions (#4827, FCY-488)
  • Avoid Invoice Discount on projects (#4948, FCY-510)
  • Respect job status on creation of sales and purchase documents (#4966, FCY-464)
  • Set two functions to global (#4976, FCY-516)
  • Event Request OnBeforeTransferfieldShipToCodeInTab36 (#4989, FCY-521)
  • Prevent assembly on sales order if referenced by job (#5037, FCY-526)
  • Long-dated items: reserved inventory will be planned again (#5038, FCY-519)
  • Line discount % may not be synchronized to purchase documents on job (#5094, FCY-536)
  • Long-dated items tests date against job planning line, not against supplying line (#5101, FCY-477)
  • Obligo: purchase, production, assembly und time sheet (#5153, FCY-544)
  • Enable date conflicts on reservation entries (#5161, FCY-545)

Hotfix

  • Wrong quantities in items with tracking in inventory picks (#4947, FCY-505)
  • Use calculated prices on sales quotes (#4955, FCY-499)
  • Calculation: WIP-accounts are not correctly discharged on finished production orders (#5034, FCY-522)
  • Calculated price will be overwritten (#5086, FCY-500)

21.3.59448.0 - 2023-01-25#

Change

  • General performance and stability improvements.

21.3.57126.0 - 2023-01-10#

Change

  • Missing License error on opening item list. (#4726, FCY-471)
  • Missing reservation to firm planned production order on creation from job. (#4754, FCY-476)
  • Optimized readability on factbox in calculation worksheet. (#4784, FCY-483)
  • Fixed errors on order planning from simulated E+D-Order. (#4799, FCY-486)

Hotfix

  • It is no longer possible to create multiple sales quote, sales order or sales return order lines from one job planning line. This could lead to errors on synchronization. (#4745, FCY-408)

21.2.54853.0 - 2022-12-20#

Hotfix

  • Unit cost in planning components are incorrect (#4680, FCY-466)
  • Modules could be activated in module setup (#4685, FCY-469)

21.2.54212.0 - 2022-12-15#

Important note

The previous build version 21.2.53247.0 must be first installed.

Hotfix

  • Field "type of part provided" of item not transfered to production bom line. (#4597, FCY-444)
  • Different corrections in report "production order components and routing"
  • job cards not printed in multilevel production orders (#4604, FCY-439)
  • date expression was incorrect (#4613, FCY-443)
  • Multilevel costs in E+D production orders was incorrect calculated (#4634, FCY-147)
  • Line discount % was not editable if sales document exists (#4618, FCY-451)

21.2.53247.0 - 2022-12-08#

Important note

This release and further builds of this minor version must be installed on updates to saas enviroment.

Note

Update FACTORY options in KUMAVISION module setup is now required.

Hotfix

  • Different corrections in sales postings of jobs in combination with item tracking (#4507, FCY-414)
  • Calulation condition material costs was incorrect calculated in calculation details (#4554, FCY-438)
  • After changes in sales documents wrong Vat-Id was transfered to masterdata (#4539, FCY-428)

Change

  • Monetarisation of "calculation" and "FACTORY base" implemented (#4509, FCY-416)
    Calculation module should be controlled in KUMAVISION module device setup.
  • e-mail functionality with attachments set obsolete (#4529, FCY-423)
    Due to the Saas environment, the e-mail functionality with file attachments is no longer supported.
  • Length of enum captions corrected (#4530, FCY-426)
    All enums with a longer name (more than 30 characters) must be created with a shortened name.
    Upgrade routines are not necessary because rename works with enums without breaking change.

21.1.50404.0 - 2022-11-18#

Warning

With this version different breaking changes occurs.

Note

Update FACTORY options in KUMAVISION module setup is required if plant engineering or delivery schedules are used.

Hotfix

  • Update sales price and line discount from project planing line to sales invoice line failed (#3960, FCY-20)
    Sales invoice Lines for posted sales shipments will not be updated by project planning lines only related sales order lines were updated.
    this bug will be corrected.
  • Posting error occurs if return order posted and extended prices are activated (#4243, FCY-370)
  • Assignment in combine purchase quotes matrix failed if language differs to ENU (#4250, FCY-369)
  • Different corrections in combine purchase quotes (#4297, FCY-380)
    Assignment of requisition line should not removed if combine purchase quote line will canceled.
    Fields in planning worksheet removed.
  • Captions in function finish production order in E+D production orders added (#4320, FCY-384)
  • Production journal of stored production order in E+D production orders could not called if partial output posted. (#4338, FCY-390)
  • Printing attributes in master documents are incorrect (#4343, FCY-389)
  • Field length of routing version code in item versions corrected (#4353, FCY-398)
  • Routing no. and production BOM no. incorrectly assigned to production order lines in relation with item versions (#4354, FCY-401)

Change

  • Printing item tracking information in posted sales shipments failed with relation to project planning lines (#4267, FCY-373)
  • Bin code not assigned if sales invoice line created from project planning line (#4268, FCY-374)
  • Field "Name 3" completely removed (#4317, FCY-383)
    Use custom app "KVSExtendedAddress" in future if "Name 3" is required.
  • Monetarisation of "plant engineering" and "delivery schedules" is now activated (#4323, FCY-386)